Thursday 7th December 2006

Again dry over night but by lunch time heavy storms and high winds were the norm.I fetched David from Ledwyche to collect his tractor and trailor. We both loaded Wayne Crowther with wheat before lunch After David went home to load his wheat.Then Steve and I moved some scrap from infront of the trailor unloading elevator to help the trailor access. David returned with a load of his milling wheat for drying. We cleaned the wet bin down and set the trace chain monitor to clear the dryer down of feed wheat and allow the milling wheat to fill the dryer behind it and then stop, it appears to have worked as set.

Blog Archive