0mm rain in last 24hrs 0.3C temp and snow lying around at 9:00am David came out and I helped him with the atic bathroom plumbing. We replaced the sink taps and cleared the blockage in the waste pipe then redirected the middle floor bath and sink waste pipes. After tea I returned a computer to Westhope.